Released: April 2026 | Availability: All PCF accounts | Products: PCF
When you upload a multi-product BOM file, the platform now checks your data before processing begins. If something is wrong, you see a clear summary and can download an annotated error report, instead of finding problems later or contacting support.
What's new
Validation during pre-processing
Every BOM file is checked before any products are created. If all rows pass, processing continues as before. If errors are found, the import pauses and shows how many rows have issues, with a link to the error report. Warnings are shown separately and do not block the import.
Downloadable error report
Download an annotated XLSX copy of your file with:
A Valid entry? column marking each row.
An Error description column in plain language.
Invalid cells highlighted in red.
A Data Format Guideline sheet explaining each column.
Country of origin dropdowns with valid ISO country codes.
Fix the flagged rows in the file, upload it again, and continue.
Checks that block the import
HS code: a valid 6-digit code. Required on top-level product rows; if filled in elsewhere, it is always checked.
Amount: a positive number, not empty.
Unit: a weight unit (g, kg, t, tn, LT, lb) or pcs.
Product unit: required on top-level product rows, for example kg, t, l, m², m³ or pcs.
Country of origin: optional, but if filled in must be a valid ISO 3166-1 code.
Warnings
Placeholder item names such as "Misc", "Other", "TBD", "N/A", "Unknown" or "Various" are flagged, because they prevent accurate emission factor mapping.
File size limit
Multi-product BOM uploads are limited to 500,000 rows. Larger files are rejected with a clear message.
How to use it
Upload your BOM via Add new product > Multi-level product.
If validation passes, continue to emission factor mapping as usual.
If it fails, download the error report, fix the rows and upload again.
If there are only warnings, review them and decide whether to continue.